CONSTRUCTION OF THE S17 EXPRESSWAY, VIADUCTS

Construction of the S17 expressway Kurów-Lublin-Piaski, section 3, viaducts WS-07, WD-13F, KL-11A, KL-13D, KL-13G.
Supplied approximately 1 300 tonnes of steel structures with assembly.


CONSTRUCTION OF THE S17 EXPRESSWAY, BRIDGE MS-16

Construction of the S17 expressway Kurów-Lublin-Piaski, section 4, bridge MS-16.
Supplied approximately 4 700 tonnes of steel structures with assembly.


BRIDGE OVER THE WISŁOKA RIVER IN GAWŁUSZOWICE

Bridge over the Wisłoka river in Gawłuszowice, within the project “Elimination of development barriers – a bridge over the Vistula River with rehabilitation of voivodship road No. 764 and opening of transport links in the direction Rzeszów – Kielce”.
Supplied approximately 1 720 tonnes of steel structures with assembly.


ROAD BRIDGE IN KOSZALIN

Bridge over the valley of the Dzierżęcinka river in Koszalin, being delivered within the project “Construction and reconstruction of the roads forming the outer ring of communication system of the city of Koszalin – a link between ul. BoWiD and ul. Władysława IV (streets) together with the necessary infrastructure”.
Supply of approximately 250 tonnes of steel structures with assembly.


FLYOVER WD-124 ON THE A4 MOTORWAY, DĘBICA

Further construction of the A4 Tarnów – Rzeszów motorway from Krzyż junction to Dębica-Pustynia junction, from km 502+796 to km 537+550. Steel structure of the WD-124 flyover.
HUTA POKÓJ S.A. supplied 507 tonnes of steel structures with assembly.


FLYOVER ON THE ROUTE NO. 538 IN HARTOWIEC

Construction of a new flyover in Hartowiec, Poland, on the route no. 538.
HUTA POKÓJ S.A. supplied 33.5 tonnes of steel structure.


VIADUCT OVER THE E-20 RAILWAY, SWARZĘDZ

Construction of the road linking Rabowicka street with the national road No. 92 in Jasień (Swarzędz district), Poland – viaduct over the E-20 railway.
HUTA POKÓJ S.A. supplied approximately 340 tonnes of steel structures.


VIADUCT WO-5 IN THE NORTHERN BYPASS OF PSZCZYNA TOWN

HUTA POKÓJ S.A. supplied approximately 720 tonnes of steel structures.


CONSTRUCTION OF THE S19 EXPRESSWAY

Construction of the S19 expressway between Rzeszów Zachodni and Świlcza junctions from km 0+717.63 to 5+093.00. Viaducts WA-151 and PGG-1.
HUTA POKÓJ S.A. supplied approximately 205 tonnes of steel structure.


RAILWAY BRIDGE OVER THE RABA RIVER

Modernisation of the E30/C-E 30 railway line on the Kraków-Rzeszów section, 3rd stage – the Kraków – Medyka – national border railway line, the Podłęże to Bochnia section in km 16,000-39,000. Railway bridge over the Raba river in km 80,678.
HUTA POKÓJ S.A. supplied approximately 240 tonnes of steel structures.


ROAD VIADUCT, GIERDZIEJEWSKI STREET, WARSAW

Construction of an intersection in the Mory area between ul. Poznańska (national road 2) and the creation of ul. Gierdziejewskiego (linking the districts of Warszawa Ursus with Warszawa Bemowo) – road viaduct over the PKP Warszawa – Poznań railway line.
HUTA POKÓJ S.A. supplied approximately 1 570 tonnes of steel structures.


VIADUCT ALONG THE E30/C-E 30 RAILWAY LINE

Modernisation of the E30/C-E 30 railway line on the Kraków-Rzeszów section, 3rd stage – the Kraków – Medyka – national border railway line, the Tarnów to Dębica section in km 80,200-111,500. Viaduct in km 80,678.
HUTA POKÓJ S.A. supplied approximately 600 tonnes of steel structures.


CONSTRUCTION OF THE S2 EXPRESSWAY – SIX VIADUCTS

Construction of the S2 expressway from the Konotopa junction to the Puławska junction, approximately 15 km in length including an approximate 5 km expressway section linking the Airport junction with the Okęcie International Airport junction and the Marynarska junction. Viaducts WA-05, WA-06, WA-07, WA-10, WA-11, WA-12.
HUTA POKÓJ S.A. supplied approximately 2 430 tonnes of steel structures.


BRIDGE OVER THE RIVER SKAWA, MAKÓW PODHALAŃSKI

Construction of a bridge over the river Skawa in Maków Podhalański in km 43.731 as part of national road 28.
HUTA POKÓJ S.A. supplied approximately 610 tonnes of steel structures.


CONSTRUCTION OF THE A4 MOTORWAY, RZESZÓW TO KORCZOWA

Construction of the Jarosław junction to Wierzbna (without junction) to Radymno junction section on the A4 Rzeszów to Korczowa motorway, – approximate length 25 km. Viaducts WD-19, WD-32.
HUTA POKÓJ S.A. supplied approximately 560 tonnes of steel structures with assembly.


CONSTRUCTION OF PROVINCIAL ROAD 631 – BRIDGE GIRDERS

Construction of provincial road 631 along ul. Marsa and ul Żołnierska (streets) in Warsaw between the ul. Marsa junction and the city border (km 0+000 – km 4+820.93) – Stage 1 (from ul. Naddnieprzańska to the intersection of ul. Marsa – Rekrucka – Żołnierska). Bridge girders.
HUTA POKÓJ S.A. supplied approximately 230 tonnes of steel structures.


CONSTRUCTION OF THE S8 EXPRESSWAY

Construction of the S8 expressway Walichnowy-Wrocław, section 5, viaducts WS 5.20, WS 5.21.
Supplied approximately 1 730 tonnes of steel structures with assembly.


FATHER BERNATEK’S BRIDGE, KRAKOW, POLAND

The foot and bike bridge over Vistula River in Kraków which links the districts of Kazimierz and Podgórze and is 125 m long. HUTA POKÓJ S.A. supplied the main tubular support structure weighing 230 tons. The outer jacket is 2020 mm in diameter, thickness is 17.5 mm, inner jacket is 1620 mm in diameter, thickness is 17.5 mm, length of single components is 15 m.


WS-26 FLYOVER THE CITY OF POZNAŃ WEST RING ROAD

WS-26 flyover the city of Poznań West Ring Road, section Złotkowo-Głuchowo, Poland
The WS-26 flyover (arch-suspended structure) on the S11 National Road in the section Złotkowo – A2 Highway (Głuchowo), within the City of Poznań West Ring Road. The total weight of the structure was 3 thousand tons.
HUTA POKÓJ S.A. delivered 1.3 thousand tons of box structures (section of 1500 x 1800 mm), constituting the main support structure of the flyover (length of single components 15 – 20 m).


DUCHESS JOLANTA’S BRIDGE OVER THE PROSNA RIVER IN KALISZ, POLAND

HUTA POKÓJ S.A. delivered the load-carrying structure of total weight about 280 tons.
Steel arch structure consists of 2 arch girders, 2 main girders, suspension members connecting both the girders (arch and main), cross-beams connecting two main girders and bracings joining up arch girders. The bridge is 57.8 meters long in total and 8.84 meters wide.


MODERNISATION OF THE E 65/CE 65 RAILWAY LINE

Modernisation of the E 65/CE 65 railway line, section Warszawa Wschodnia – Działdowo – Gdynia (LCS Ciechanów area) – section Świercze – Ciechanów from 70.780 to 99.450 km. Rebuilding of a bridge at (94.639) 94.641 km.
HUTA POKÓJ S.A. supplied approximately 150 tonnes of steel


CONSTRUCTION OF THE S7 EXPRESSWAY BETWEEN OLSZTYNEK AND NIDZICA

Construction of the S7 expressway between Olsztynek and Nidzica (km 175+800 to km 203+600), including the Olsztynek bypass, as part of national road 51 (km 109+500 to km 115 + 500). Bridge ED-1A.
HUTA POKÓJ S.A. supplied approximately 1550 tonnes of steel


CONSTRUCTION OF THE NORTH-EASTERN BIELSKO-BIAŁA BYPASS

Construction of the north-eastern Bielsko-Biała bypass, from the Komorowice junction to the Mikuszowice (Żywiecka/Bystrzańska) junction.
HUTA POKÓJ S.A. supplied approximately 130 tonnes of steel.


ENHANCEMENT OF NATIONAL ROAD 8 TO THE STATUS OF AN EXPRESSWAY

Construction of the Jarosław – Radymno section on the A4 Rzeszów to Korczowa motorway. Bridge M/PZ-27.
HUTA POKÓJ S.A. supplied approximately 790 tonnes of steel


CONSTRUCTION OF THE JAROSŁAW – RADYMNO SECTION ON THE A4 MOTORWAY

Budowa autostrady A4 Rzeszów – Korczowa, odcinek Jarosław – Radymno. Most M/PZ-27.
HUTA POKÓJ S.A. dostarczyła konstrukcję stalową o ciężarze ok.790 ton


ACOUSTIC BAFFELS

HUTA POKÓJ S.A delivers load-bearing posts for acoustic baffles built along roadways, railways or industrial areas.
Several thousand of load-bearing posts manufactured in various configurations were built i.a. along the roads: “Zakopianka”, highway A-4 Krakow-Katowice, highway A-4 Tarnow-Rzeszow, expressway Bielsko – Cieszyn, Konotopa – Warszawa road junction. The structure is based on hot-rolled steel sections HEA or HEB type.


MODERNISATION OF THE RAILWAY VIADUCT ON THE SZELIGI – BIAŁA RAWSKA ROUTE

Supplied approximately 825 tonnes of steel structures.


BRIDGE OVER THE POPRAD RIVER

Bridge over the Poprad river on the route Nowy Sącz – Piwniczna.
Supplied approximately 980 tonnes of steel structures with assembly.