ROAD INFRASTRUCTURE AND TRANSPORT
PERFORMANCE OF A TEMPORARY LOAD CONSTRUCTION FOR THE REBUILDING OF RAILWAY BRIDGES ON THE E65 LINE, ODC. WARSAW – GDYNIA, POLAND
2009 – 207 Mg
EXECUTION OF A CONSTRUCTION OF A STEEL BIKE AND CYCLING BRIDGE OVER THE VISTULA RIVER DURING THE ROUTE A4, KRAKÓW, POLAND
2007 – 220 Mg
EXECUTION OF BRIDGE CONSTRUCTION THROUGH THE VISTULA RIVER ON ROAD NO 933 OŚWIĘCIM – CHRZANÓW, BOBREK, POLAND
2006 – 430 Mg
CONSTRUCTION CONSTRUCTIONS
EXTENSION OF BEWA MINERAL WATER WAREHOUSE IN KLESZCZÓW
2015 – 180 Mg
MANUFACTURE AND ASSEMBLY OF CONSTRUCTION OF STRUCTURES OF THE MAXIMUS OBJECT, NADARZYN, POLAND
2009 – 800 Mg
MONDI PRODUCTION HALL IN THE WORLD. CRANE BEAMS.
2008 – 390 Mg
EXECUTION OF KEFLAR CONSTRUCTION CONSTRUCTION, COPENHAGEN, DENMARK
2008 – 330 Mg
EXECUTION OF CONSTRUCTION OF PROCTER & GAMBLE HALL, ALEKSANDRÓW ŁÓDZKI, POLAND
2008 – 253 Mg
EXECUTION OF HALL CONSTRUCTION – GRUPA KĘTY S.A., KĘTY, POLAND
2007 – 706 Mg
EXECUTION OF STEEL CONSTRUCTION CER, PRUSZCZ GDAŃSKI, POLAND
2006 – 238 Mg
EXECUTION OF STEEL CONSTRUCTION – LG PHILIPS LCD POLAND FACTORY, KOBIERZYCE, POLAND
2006 – 1,276 Mg
EXECUTION OF STEEL STRUCTURE OF NOVA HUT A.S. HALL, OSTRAWA, CZECH REPUBLIC
1996 – 2 860 Mg
EXECUTION OF STEEL STRUCTURE OF THE HOMOUD TOWER BUILDING, KUWAIT, KUWAIT
1995/1996 – 680 Mg
ENERGY INDUSTRY
CONSTRUCTION OF EXHAUST DISSIPATION DESCRIPTION FOR BLOCKS 5 AND 6 AT THE DOLNA ODRA POWER PLANT IN NOWY CZARNÓW NEAR GRYFINA. SORBENT STORAGE SILOS
2010 – 110 Mg
CONSTRUCTION OF ROOF. HOT ELECTROFILTER FOR BLOCK A6 OF OBERNOVAC POWER PLANT IN SERBIA.
2010 – 65 Mg
EXECUTION OF TWO ELECTROFILTERS FOR NEW CONSTRUCTED D AND E POWER BLOCKS AT WESTFALEN RWE AG POWER PLANT IN HAMM, GERMANY. SUPPORTING ELECTROFILTERS AND CHAMBER CONSTRUCTION.
2010 – 1 520 Mg
EXECUTION OF SORBENT, ASH AND BOTTOM ASH TANKS FOR EC ŁAGISZA IN BĘDZIN.
2007 – 735 Mg
EXECUTION OF STEEL CONSTRUCTION FOR EC ŁAGISZA IN BĘDZIN. BOILER SUPPORT AND ACCOMPANYING STRUCTURES.
2006 – 2 370 Mg
BOILER SUPPORT CONSTRUCTION FOR ESB GROUP POWER PLANTS: LANESBOROUGH – LOUGH REE POWER PLANT, SHANNON BRIDGE – WEST OFFALY PLANT, IRELAND
2003 – 1,610 Mg
BOILER SUPPORT AND ACCOMPANYING STRUCTURES. – EC CHORZÓW, CHORZÓW, POLAND
2002 – 3,000 Mg
EXECUTION OF CONSTRUCTION OF DESCRIPTION OF DEPENDENT DEPLOYMENT, CASTROP-RAUXEL, GERMANY
1993 – 1,200 Mg
TANK CONSTRUCTIONS
TWO TANKS V = 9,400 M3 FOR THE PKN ORLEN WAREHOUSE BASE IN WROCŁAW.
2008-2009 – 620 Mg
THREE DOUBLE-COAT TANKS WITH DOUBLE BOTTOM AND FIXED ROOF V = 32,000 M3 FOR THE LOTOS GROUP REFINERY IN GDAŃSK.
2008-2009 – 3 410 Mg
TWO TANKS V = 10,000 M3 FOR FUEL BASE IN ROLLERS.
2007 – 730 Mg
TWO TANKS V = 10,000 M3 FOR FUEL BASE IN EMILIANÓW.
2006-2007 – 800 Mg
TANK V = 100,000 M3 FOR FUEL BASE IN ADAMÓW.
2003 – 2,700 Mg
TANK V = 100,000 M3 FOR FUEL BASE IN PLEBANCE.
2003 – 2,000 Mg