Building structures

STORAGE WAREHOUSE FOR BEWA

Construction of a storage warehouse for BEWA in Piaski near Kleszczów, Poland.
HUTA POKÓJ S.A. supplied approximately 90 tonnes of steel structures.


CONSTRUCTION OF THE WEYERHAUSER PRODUCTION PLANT IN GDAŃSK

HUTA POKÓJ S.A. supplied approximately 140 tonnes of steel structures.


OXIDE HALL ZGH BOLESŁAW S.A. IN BUKOWNO

Oxide hall – Stage 1 – Installation for enhanced de-chlorination, de-fluorization and leaching of untreated zinc oxide, produced as a by-product when processing steel ash in ZGH “Bolesław” S.A. (The Boleslaw Mine and Metallurgical Plant) in Bukowno, Poland.
HUTA POKÓJ S.A. supplied approximately 600 tonnes of steel structures.


LEROY MERLIN DIY MARKET, MIKOLOW, POLAND

HUTA POKÓJ S.A. supplied approximately 190 tonnes of steel


PASSENGER TERMINAL AIRPORT, WROCLAW, POLAND

HUTA POKÓJ S.A. delivered roof truss and façade structure components of total weight of 630 tons. Length of a single truss in the box structure is over 90 m.


THE WATT PRODUCTION WAREHOUSE IN SOSNOWIEC

HUTA POKÓJ S.A. supplied approximately 190 tonnes of steel


FRUIT SORTING AND COOLING WAREHOUSE FOR THE SADY KRAJNY GROUP IN BIAŁOŚLIWIE

HUTA POKÓJ S.A. supplied approximately 70 tonnes of steel


THE ZPOW DAWTONA STORAGE WAREHOUSE IN BŁONIE NEAR WARSAW

HUTA POKÓJ S.A. supplied approximately 100 tonnes of steel


HANGAR AT JASIONKA AIRPORT NEAR RZESZÓW

HUTA POKÓJ S.A. supplied approximately 110 tonnes of steel


A STORAGE WAREHOUSE FOR ENERGOSERWIS S.A. IN LUBLIN

HUTA POKÓJ S.A. supplied approximately 230 tonnes of steel


A DISTRIBUTION WAREHOUSE FOR NICOLS POLAND IN TRAWNIKI NEAR LUBLIN

HUTA POKÓJ S.A. supplied approximately 140 tonnes of steel


A WAREHOUSE FOR TCL OPERATIONS POLAND IN ŻYRARDÓW

HUTA POKÓJ S.A. supplied approximately 140 tonnes of steel


A PRODUCTION/STORAGE WAREHOUSE FOR E KROMISS-BIS IN CHRZANÓW

HUTA POKÓJ S.A. supplied approximately 150 tonnes of steel


CONSTRUCTION OF A LEROY MERLIN DIY STORE IN GLIWICE

HUTA POKÓJ S.A. supplied approximately 240 tonnes of steel


CONSTRUCTION OF CEMENT MILL NO 4 FOR GÓRAŻDŻE CEMENT SA IN CHORULA NEAR OPOLE

HUTA POKÓJ S.A. supplied approximately 620 tonnes of steel


A PRODUCTION/STORAGE WAREHOUSE FOR TREKO LASER IN SKAWINA

HUTA POKÓJ S.A. supplied approximately 240 tonnes of steel


EXPANSION OF THE PASSENGER TERMINAL AT POZNAŃ-ŁAWICA AIRPORT

HUTA POKÓJ S.A. supplied approximately 210 tonnes of steel


TWO HELICOPTER HANGARS (RECONNAISSANCE AND WRE)

Two helicopter hangars (reconnaissance and WRE) for the Military Unit in Nowy Glinnik
HUTA POKÓJ S.A. supplied approximately 160 tonnes of steel


EXPANSION OF THE VLASSENROOT PRODUCTION PLANT IN GLIWICE

HUTA POKÓJ S.A. supplied approximately 130 tonnes of steel


CONSTRUCTION OF A WAREHOUSE FOR SIR-DRUK IN STAWISZCZE NEAR SIERADZ

HUTA POKÓJ S.A. supplied approximately 130 tonnes of steel


FUTURA PARK KRAKOW COMPLEX, MODLNICZKA, POLAND

HUTA POKÓJ S.A. has completely supplied, carried out and erected the 700 ton roof construction.


CREATON ROOF TILE PRODUCTION PLANT, WIDZISZEWO NEAR KOŚCIAN, POLAND

HUTA POKÓJ S.A delivered steel frame structure for production hall, ca. 500 ton. The structure is based on welded sections from in-house works.


FANSULD IRON FOUNDRY, KONSKIE, POLAND

Steel structure for the FANSULM Iron Foundry production complex. HUTA POKÓJ S.A. delivered about 130 tons of assembly-ready elements: columns, bracings, spandrel beams, roof beams, platforms and moulding sand storage bins.


SILO FOR ARCELORMITTAL POLAND STEELWORKS, DABROWA GORNICZA, POLAND

The silo is an element of installation for pulverised coal injection (PCI) into blast furnace no. 2, under construction in 2011.
HUTA POKÓJ S.A. delivered about 340 tons of steel structure, in that: silo with supporting ring, main structure of silo building and distribution building, construction of platforms and stairway as well as railings.


SSBR RUBBER PRODUCTION LINE IN THE PRODUCTION PLANT SYNTHOS

SSBR rubber production line in the production plant SYNTHOS Dwory 7 in Oświęcim.
Hall structures.
Supplied approximately 1 560 tonnes of steel structures with assembly.


RECOVERY BOILER IN THE GŁOGÓW COPPER SMELTER (KGHM)

Supportive steel structure and platforms.
Supplied approximately 1 500 tonnes of steel structures.


THERMAL RECYCLING FACILITY IN KRAKÓW

Elements of the main building structure, as well as structures of other buildings within the complex.
Supplied approximately 2 400 tonnes of steel structures.


KGHM GŁOGÓW COPPER PLANT

Steel structure elements for Suspension Roaster House and Electric Furnace House at Głogów Copper Plant (KGHM).
Supplied approximately 3 500 tonnes of steel structures.